Mitel TA7102 Installation Manual page 14

Hide thumbs Also See for TA7102:
Table of Contents

Advertisement

Regulatory compliance and safety
information received
Warranty card received
Software version verified
Rack, desktop, or wall mounting of
chassis completed
Initial electrical connections established
ASCII terminal attached to console port
Cable length limits verified
Initial configuration performed
Initial operation verified
Site Log
Mitel recommends that you maintain a site log to record all actions relevant to the TA7102, such as:
Installation: Print a copy of the installation checklist and insert it into the site log.
Upgrades and maintenance: Use the site log to record ongoing maintenance and expansion history.
Update the site log to reflect the following:
Network Information
When planning the installation of the TA7102, you should consider the following network information.
Network Diagram
It is always good practice to draw a network overview diagram that displays all neighboring IP nodes,
serial connected elements, and other components. It is recommended that you keep a copy in the site log
(see "Site Log" for more information on keeping a site log).
IP-Related Information
Before you can install the i, you need to have the following information:
153/1531-ANF 901 14 B 2017-03-08
Configuration changes
Maintenance schedules, requirements, and procedures performed
Comments, notes, and problems
Software changes and updates to firmware
TA7102 Hardware Installation