Valor 546LFB ZC Portrait Ledgeview Front Installation And Owner's Manual

Valor 546LFB ZC Portrait Ledgeview Front Installation And Owner's Manual

Approved for use with valor heater models 530 only in zc applications; not compatible with 530ini/ipi insert engines
Hide thumbs Also See for 546LFB ZC Portrait Ledgeview Front:
Table of Contents

Advertisement

Available languages

Available languages

Approved for use with Valor heater models 530 only in ZC applications;
NOT compatible with 530INI/IPI insert engines
DANGER
!
A barrier designed to reduce the risk of burns from the hot
viewing glass is provided with this appliance and shall be
installed for the protection of children and other at-risk
individuals.
The 546LFB ZC Portrait Ledgeview Front
is designed to be used on the 530 Valor
heaters when installed in a zero clearance
application.
For installation with an insert, use 546LFB
Ledgeview Fronts.
4005278-01
©2016, Miles Industries Ltd.
P
ORTRAIT
Ledgeview Fronts 546LFB ZC
Installation and Owner's Manual
HOT GLASS WILL
CAUSE BURNS.
DO NOT TOUCH GLASS
UNTIL COOLED.
NEVER ALLOW CHILDREN
TO TOUCH GLASS.
Overview (530 engine sold separately)
Leave this manual
with the appliance.
Retain this manual for
future reference.
Notes: This kit must be installed
or serviced by a qualifi ed installer,
service agency or gas supplier.
These instructions are to be used
in conjunction with the main
installation instructions for the
above listed heater models.
Insulation
Hardieboard Panel
ZC Baffle
Heat
exchanger
cover
Stud brackets (2)
Backing Plate
Ledgeview Front with Barrier screen
INS TAL LE R
CON S UM E R
Stand off brackets
530 Engine
(sold separately)
Backing frame
Assembly

Advertisement

Table of Contents
loading

Summary of Contents for Valor 546LFB ZC Portrait Ledgeview Front

  • Page 1 ORTRAIT Ledgeview Fronts 546LFB ZC Approved for use with Valor heater models 530 only in ZC applications; NOT compatible with 530INI/IPI insert engines Installation and Owner’s Manual DANGER INS TAL LE R Leave this manual with the appliance. HOT GLASS WILL CON S UM E R CAUSE BURNS.
  • Page 2: Kit Contents

    Kit Contents Insulation 546 ZC Stand off brackets 1 Backing Frame assembly 1 Backing plate Hardieboard 1 Ledgeview Front assembly 1 Heat Exchanger Cover 1 Ceiling Panel 1 ZC Baffl e 1 Barrier Screen (fi tted) 2 Stand Offs Ceiling ZC baffle Heat Backing frame...
  • Page 3 Corner dimensions 90° Face of wall studs 48” (1219 mm) Framing Wall Finish 6-1/8” (154 mm) 32” (813 mm) cement board to header supplied Note - There is a 1” (25 mm) gap between bottom of cement board and top of backing frame assembly 26-7/8”...
  • Page 4 Adjustability of the Clearview Front ZC • Method 1. The appliance’s position within the framing cavity may be adjusted forward in the framing up to 1” to accomodate additional wall fi nish thickness “tucked” behind the backing plate. • Method 2. The Backing Plate is also adjustable to accomodate up to an additional 3/4”...
  • Page 5: Installation

    Installation 3. Install stud brackets over top of the backing plate frame assembly with 2 screws per side. 1. Fit the ZC baffl e under the top panel of the See Adjustability of the Ledgeview Front ZC section appliance case. Secure as shown with 2 thread for more information on position of brackets.
  • Page 6 6. Insert the appliance into the framing and secure the 8. Remove the window if not already done. Connect stud brackets with two wood screws per side (not the gas and venting. See the heater installation supplied). Make sure the framing is leveled. manual for more information.
  • Page 7 12. Fit a 1/2” thick non-combustible wall board around 14. Slide the heat exchanger cover onto the heat the appliance and the non-combustible cement exchanger. Note its shape and orientation. board. You can then apply additional fi nish over the wall board. See Adjustability of the Ledgeview Front ZC section for more information.
  • Page 8: Repair Parts List

    Because our policy is one of constant development and improvement, details may vary slightly from those given in this publication. Designed and Manufactured by / for Miles Industries Ltd. 190 – 2255 Dollarton Highway, North Vancouver, B.C., CANADA V7H 3B1 Tel. 604-984-3496 Fax 604-984-0246 www.valorfi replaces.com...
  • Page 9: Directives D'installation

    ® LE PREMIER FOYER À GAZ RADIANT Devantures Ledgeview 546LFBZC Homologuée pour usage avec le foyer Valor 530 seulement dans les applications à dégagement zéro (ZC); incompatible avec les foyers encastrables 530INI/IPI Directives d’installation DANGER INS TAL L ATE U R Laissez cette notice avec l’appareil.
  • Page 10: Contenu Du Kit

    Contenu du kit Isolant 546 ZC 1 Encadrement de plaque de fi nition Écarteurs 1 Plaque de fi nition Panneau de béton 1 Devanture Ledgeview 1 Couvercle d’échangeur de chaleur 1 Panneau du haut 1 Défl ecteur ZC 1 Pare-étincelles (installé) 2 Écarteurs Panneau Déflecteur...
  • Page 11 Dimensions en coin 90° Face of Façade de la wall studs charpente 48” (1219 mm) Encastrement Panneau de gypse 6-1/8” (154 mm) 32” (813 mm) panneau de béton à la base du linteau (fourni) Note - Espace de 1” (25 mm) entre le bas du panneau de béton et le dessus de l’encadrement de la...
  • Page 12 Ajustabilité de la Devanture Clearview ZC • Méthode 1. La position de l’appareil peut être avancée dans la charpente jusqu’à 1 pouce (25 mm) afi n de permettre une épaisseur additionnelle de matériau de fi nition sous le rebord de la plaque de fi...
  • Page 13 Installation 3. Fixez les supports de montage sur l’encadrement de plaque de fi nition à l’aide de 2 vis par côté. 1. Placez le défl ecteur sous la paroi supérieure de la Consultez la section Ajustabilité de la Devanture caisse du foyer. Fixez-le avec deux vis fournies. Ledgeview ZC pour plus d’information.
  • Page 14 6. IInsérez l’appareil dans l’encastrement et fi xez 8. Enlevez la fenêtre si ça n’est déjà fait. Branchez les supports de montage aux poteaux de chaque l’alimentation de gaz et montez le système côté avec deux vis à bois par côté (non-fournies). d’évacuation selon les directives fournies avec Assurez-vous que l’installation est de niveau.
  • Page 15 12. Appliquez un panneau de placoplâtre 14. Couvrez l’échangeur de chaleur avec le couvercle incombustible de 1/2 pouce (13 mm) d’épaisseur d’échangeur de chaleur. Notez sa forme et son autour du panneau de béton et du foyer. Vous orientation. pouvez ensuite appliquer un autre matériau de fi...
  • Page 16: Entretien

    Entretien Liste de pièces AVERTISSEMENT Description Number NE TOUCHEZ PAS LE NE TOUCHEZ PAS LE PARE-ÉTINCELLES PARE-ÉTINCELLES, LA , LA Isolant 620B987 DEVANTURE OU LA FENÊTRE LORSQU’ILS DEVANTURE OU LA FENÊTRE LORSQU’ILS Écarteur gauche 4005266 SONT CHAUDS! SONT CHAUDS! Laissez le foyer refroidir avant de Laissez le foyer refroidir avant de Écarteur droit 4005265...

Table of Contents