Installation; Initial Setup Steps - Gram BIOBASIC 210 User Manual

Table of Contents

Advertisement

Installation

Initial setup steps

Due to safety and operating reasons, the cabinet must not be used
outdoors. The cabinet should be installed in a dry and sufficiently
ventilated area. To ensure efficient operation, the cabinet should not be
installed in direct sunlight or close to heat sources.
Avoid placement of the cabinet in a chloric/acidic environment due to
risk of corrosion.
Clean the cabinet with a mild soap solution prior to use.
If the cabinet has been laying down (e.g. during transport.).
The cabinet must stand up-right for 24 hours prior to being turned on.
6 |
BIOBASIC MANUAL
Certain cabinets are shipped
with a protective film that
should be removed prior to
putting the cabinet into service.

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the BIOBASIC 210 and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Biobasic 310Biobasic 410

Table of Contents