Site Planning and Maintenance Records
This appendix includes the following sections:
•
•
•
Site Preparation Checklist
Planning the location and layout of your equipment is essential for successful system operation, ventilation,
and accessibility.
Consider heat dissipation when sizing the air-conditioning requirements for an installation.
Table 24: Site Planning Checklist
Task No.
1
OL-24475-03
Site Preparation Checklist, on page 81
Contact and Site Information, on page 83
Chassis and Module Information, on page 84
Planning Activity
Space evaluation:
• Space and
layout
• Floor covering
• Impact and
vibration
• Lighting
• Maintenance
access
A P P E N D I X
Verified By
Cisco UCS 6200 Series Fabric Interconnect Hardware Installation Guide
C
Time
Date
81
Need help?
Do you have a question about the UCS 6248 UP and is the answer not in the manual?