Download Print this page

Pay Attention; Package Contents - Mellanox Technologies SX6015 Quick Installation Manual

1u switch systems
Hide thumbs Also See for SX6015:

Advertisement

Pay Attention!

• All servers and systems in the rack should be planned with the airflow
direction. All FRU components must have the same air flow direction. A
mismatch in the air flow will affect the heat dissipation.
• The FRUs are extractable. The rails should be attached to the ports side
of the system, so this side is adjacent to the cabinet. This will allow you
to slide the FRUs, in and out.

Package Contents

• 1 x System
• Rail Kit for short depth (17"-24" / 432-610mm) or standard depth (24"-
34" / 610-863mm) racks
• 1or 2 (according to order) x Power cables – Type C13-C14
• 1 x Harness RS232 2M cable – DB9 to RJ-45 (for managed systems
only)
• Quick Start Guide
If anything is damaged or missing, contact your Mellanox representa-
tive at support@mellanox.com.
2

Advertisement

loading

This manual is also suitable for:

Sx6025Sx6036gSx6036Sx6018