Advanced Sensors OIW-EX 1000 Handbook page 13

Oil in water monitors
Table of Contents

Advertisement

OIW-EX 1000 - Spectrometer Handbook
Code: OIW-HBO-0005 Version: EX-002
Date: 18 March 2010
2.4.1.2 Spectrometer Standard Creation Process
Before you start to create a Spectrometer Standard you need to specify the number of
Spectra you wish to form the Standard. This can be done with the Standard Size
control. Once you are happy with the standard size a click on the Create Standard
button will start the process; see Figure 7. The number of samples used to create the
Standard means that the Standard is more representative of the overall shape of the
samples passing though the analyzer. The default minimum of 5 will be fine in most
cases.
A new control Sample remaining until standard set will appear; this will be
decremented each time a sample is taken; see Figure 8.
Either leave for scheduled to run or to take a spectrometer standard just click the Take
Spectra button; see Figure 9. Repeat this process until all samples have been taken, see
Figure 11
Figure 7.
Figure 8.
Figure 10.
Figure 11.
www.advancedsensors.co.uk Tel: +44(0)28 9332 8922. FAX +44(0)28 9332 8669
Starting the Create Standard Process
Sample remaining until standard set
Take Spectra Button
Figure 9.
Sample remaining until standard set decremented
Starting the Create Standard Process
Advanced Sensors Ltd,
Page 13 of 33

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the OIW-EX 1000 and is the answer not in the manual?

Table of Contents