Hardware Installation - B&B Electronics EIR618-2SFP-T User Manual

Eighteen port managed industrial ethernet switches
Table of Contents

Advertisement

Hardware Installation

Installation Steps
1. Unpack the Industrial switch.
2. Ensure the DIN-Rail is tightly screwed to the Industrial switch. If not,
refer to DIN-Rail Mounting section for DIN-Rail installation. To panel
mount the Industrial switch, refer to Panel Mounting section.
3. Apply power to the switch (refer to the Wiring the Power Inputs
section). The power LED will light.
4. Connect CAT 5 cables to the Industrial switch's RJ-45 ports and to the
network devices
[NOTE] If the network devices do not support MID/MDIX, a
crossover cable may be required.
Manual Documentation Number: EIR618-2SFP-T_5107m
B&B Electronics Mfg Co Inc – 707 Dayton Rd - PO Box 1040 - Ottawa IL 61350 - Ph 815-433-5100 - Fax 815-433-5104 – www.bb-elec.com
B&B Electronics – Westlink Commercial Park – Oranmore, Galway, Ireland – Ph +353 91-792444 – Fax +353 91-792445 – www.bb-europe.com
19

Advertisement

Table of Contents
loading

Table of Contents