JLG 1230ES Service And Maintenance Manual page 77

Vertical mast lift
Hide thumbs Also See for 1230ES:
Table of Contents

Advertisement

Actuator - Limit Switch - Counterweight Installation (Machines S/N-0130013258 to Present)
NOTE: Assembly same for both the left and right side PHP components.
(a) When the pothole is in the deployed position (bars down), adjust limit switch
plunger just past "click", re-tighten mounting block screws to frame.
(b) Apply Loctite #222 to mounting screw threads on final tightening.
(c) Hook spring through slot in frame and the other end around the counterweight lug,
then slide the attach pin through the frame, spring, counterweight, tube spacer, install
the pin retaining ring.
3121222
1. Actuator Attach Screws/Nuts
2. PHP Actuator Assembly
3. Limit Switch (a)
4. Limit Switch Mounting Bracket (b)
5. Limit Switch Attach Screws
1
2
8
9
10
6. Torsion Spring (c)
7. Tube Spacer
8. Counterbalance Link Mounting Pin
9. Pin Retaining Ring
10. Left Side Countbalance Link
– JLG Lift –
SECTION 4 - BASE COMPONENTS
3
4
5
6
7
4-39

Advertisement

Table of Contents
loading

Table of Contents