PREPARING THE FULLY DUCTED EVAPORATOR UNIT (FAN COIL UNIT)
Circular Connection Mounting Location
1. Remove the knockouts for the drain line,
line set, and electrical on the bottom
Power
or rear of the unit (depending on your
installation location).
2. Remove the insulation from the knockout
3/8" Suction
holes.
1/4" Liquid
3. Route the bottle probe from the cellar to
the Evaporator Unit. Follow the directions
on page 33 for correct installation and
Drain
location of the bottle probe.
4. Follow the directions on page 17 to
mount the remote keypad and run the
communication cable to the Evaporator
Unit.
Circular Connector/
Bottle Probe Input
Unit Panel
Platinum Split
Rubber
Washer
Nut
www.whisperkool.com | Page 15