Omron E5AJ-A2HB Operation Manual page 69

E5*j series
Table of Contents

Advertisement

Revision code
Date
Z103-E1-5
February 1998
Z103-E3-1
March 1998
72
Revision History
Revised content
Page 4: Supply voltage and power consumption specifications changed.
Page 19: Thermac E5jJ information added to the beginning of 3-2 Setting
Flowchart .
Pages 38, 39: Terminal arrangement diagrams changed.
Page 56: Information added to 9-1 Engineering Level .
All references to model E5BJ removed.
Pages 38,39: Corrected power consumption in terminal arrangement draw-
ings (based on revision E1-5); kept terminal arrangement drawings the same
as revision E1-4.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents