Hitachi G800 Hardware Reference Manual page 70

Virtual storage platform
Hide thumbs Also See for G800:
Table of Contents

Advertisement

Item
Flash memory
L3 Cache memory
SDRAM
Data bus
Cache memory
Drive
Start-up time
Standard: 5-to-10 minutes.
The start-up time may be longer in proportion to the number of drive trays connected.
With a maximum configuration 1 controller tray and 19 drive trays, start-up time is
approximately 10 minutes.
Chassis size
Component
CBLH
SFF/LFF
DBF
Dense intermix drive tray
Mass
The table lists the values of a maximum configuration when all controllers and drives are
mounted.
Appendix A: Mechanical specifications for VSP G800
Hitachi Virtual Storage Platform G800 Hardware Reference Guide
VSP G800 mechanical specifications
Specification
32 M bytes
4 M bytes
1 G bytes
Parity
ECC (1 bit for correction, 2 bits for
detection)
Data assurance code
Item
Specification (W x D x H)
19.01 x 35.10 x 6.86 inches (483 x 891.7 x
174.3 mm)
18.97 x 22.24 x 3.47 inches (482 x 565 x
88.2 mm)
19.01 x 30 x 3.42 inches (483 x 762 x 87
mm)
18.97 x 40.51 x 6.92 inches (482 x 1,029 x
176 mm)
(includes the depth of the cable-
management arms)
70

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents