FORM 102.20-OM2
ISSUE DATE: 6/01/2015
start-up checklist
OFFICE LOCATION ______________________________________
Qualified TECHNICIAN ___________________________________
JOB NAME _____________________________________________
yORk JOB ID OR CONTRACT # ____________________________
JOB SITE LOCATION _______________________________________________________________________________
job sITE CoNTACT ANd pHoNE #___________________________________________________________________
IMPORTANT SAFETY REQUIREMENT: FOLLOW THE LATEST"LOCK OUT TAG OUT" PROCEDURE.
general unit inspectiOn
Identify and perform appropriate "lock out/tag out"
and safety rules. For details on points below see ap-
propriate section of the Installation Instruction provid-
ed with each air handler.
Serious damage to the AHU and/or sys-
tem is eminent if the AHU is operated
under any of the following conditions:
• Without proper control of dampers.
solution
AH Units
Custom
AH Units
Equipment received as ordered.
Unit checked for damage to interior and exterior.
Unit installed on flat and level surface. Outdoor unit
mounted within roof slope limitations where applicable.
Terminal screws and wiring connections secure
in control, electric and Air Modulator panels.
Air hoods installed properly.
Condensate drain properly trapped.
All wiring and tubing connections made at shipping splits.
All field piping connections complete.
All shipped loose parts installed.
Installer has cleaned out interior.
Verify all plug-ins and wire connections are tight on UV
equipment.
Verify Energy Recovery Wheel turns freely and wheel
segments are fully engaged.
Verify all ductwork is complete and available for full air flow.
JOHNSON CONTROLS
APPENDIX A – START-UP CHECKLIST
Supersedes: 100.00-CL1 (909)
air handler start-up checklist
pre start-up
Form
102.20-oM1
Form
100.31-NoM1
air handling units
unit tag # ________________________________
unit model # ______________________________
UNIT SERIAL # ___________________________
START DATE ____________________________
For VFD equipped air handlers, refer to the VFD forms
for additional requirements.
• With smoke dampers closed.
• During a fire alarm or smoke purge test.
• Any airflow restriction greater than normal.
Air Modulator
VFD Quick Start
Unit installed with proper clearances.
Visually inspect roof curb for tight seal around unit.
All penetrations MUST be sealed. All conduits MUST be
sealed internally.
Clean air filters installed properly and secured.
Filter gauge set to zero.
All field wiring complete and inspected.
All shipping splits sealed and secured properly.
pipe chase floor sealed at penetrations.
All shipping bolts and other material have been removed.
(Fan, VIFB, Energy Recovery Wheel, Damper).
Damper linkage is tight and in correct "power off" position.
Controls installation complete.
Verify all spacers removed from door edges.
Verify correct piping of split system. Reference Section 2 of
Solution IOM & Split System Application Guide (050.40-ES3).
Form 100.00-CL1 (313)
Form 100.42-NO1
107
A