5.1 PRE-POWER
CHECKS
5.2 INITIAL
POWER-UP
START-UP
This chapter provides the following information:
How to check and prepare the inverter before power-up.
How to power-up and check for proper operation.
How to operate the inverter when it is installed according
to the typical connections (refer to item 3.2 - Electrical
Installation).
The inverter shall be installed according to Chapter 3 -
Installation and Connection. If the drive project is different from
the typical suggested connections, follow the procedures
below.
DANGER!
Always disconnect the AC input power before making any
connections.
1) Check all connections
Check if the power, grounding and control connections are
correct and well tightened.
2) Check the motor
Check all motor connections and verify if its voltage and
current match the inverter specifications.
3) Uncouple the load from the motor
If the motor can not be uncoupled, make sure that the
direction of rotation (FWD/REV) can not cause damage to
the machine.
After the inverter has been checked, AC power can be applied:
1) Check the power supply
Measure the line voltage and check if it is within the
specified range (rated voltage: -15 % / +10 %).
2) Power-up the AC input
Close the input circuit breaker or disconnect switch.
3) Check if the power-up has been successful
- Inverter with keypad (HMI-CFW08-P or HMI-CFW08-RS) or
HMI-CFW08-RP
The keypad display will show: