Semi-Flush Mounting The Ied - ABB 615 Series Installation Manual

Ansi
Hide thumbs Also See for 615 Series:
Table of Contents

Advertisement

1MAC051065-MB C
4.3.2
615 series ANSI
Installation Manual
C
B
A
A070584 V2 EN
Figure 6:
Flush mounted case and plug-in unit
A
6.46 inches (164 mm)
B
6.97 inches (177 mm)
C 7.08 inches (179.8 mm)
D 6.30 inches (160 mm)
E
7.64 inches (194 mm)
F
6.02 inches (153 mm)
G 1.61 inches (41 mm)

Semi-flush mounting the IED

A mounting kit is needed for semi-flush mounting the IED. In addition to the detailed
mounting instructions, the mounting kit includes:
Raising frame
Gasket
Screws
E
F
G
D
Section 4
Mounting
19

Advertisement

Table of Contents
loading

Table of Contents