ELEMENT LINE: Service & Maintenance Manual - rev. 1.2
2. drill two holes in the ceiling or wall for the hooks (c) and insert the real plugs (d) into the holes,
3. screw in the hooks (c) into the rawl plugs(d) and tighten,
4. connect the hooks (c) to the eyebolts(a) using cables, ropes or chain (e).
The cables, ropes and chain are not supplied with the equipment.
The cables, ropes and chain must be under slight tension.
Page 3.13