Technogym MA05 Service Maintenance Manual page 37

Element series
Hide thumbs Also See for MA05:
Table of Contents

Advertisement

ELEMENT LINE: Service & Maintenance Manual - rev. 1.2
4. mark the position of two Ø 14 holes on the wall,
5. fully tighten brackets (c) to the frame,
6. drill the wall and insert rawl plugs (f) in the wall holes,
7. bring the equipment up to the wall and ensure the holes in the wall are aligned with the holes on
the bracket,
8. screw in screws (g) and tighten to the wall.
WARNING: is obligatory to secure the equipment to the wall using the appropriate
screw and brackets.
Figure 3.6-2
Page 3.11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents