MHG Heating ProCon HT 150 Installation And Operating Manual page 19

Floor standing condensing boiler range
Hide thumbs Also See for ProCon HT 150:
Table of Contents

Advertisement

© MHG Heating Ltd
9.3 Multiple Cascade ProCon HT's Conventionally Flued
Preferred Method of Fluing Cascaded units
Conventional Flue Header Arrangement.
If this method is utilised the flue must be sized to prevent back pressure effecting
other appliances on the flue system.
MHG Heating Ltd, Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR
P:0845 6448802 F:0845 6448803
E:info@mhgheating.co.uk
W: www.mhgheating.co.uk
19
010617

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProCon HT 150 and is the answer not in the manual?

Subscribe to Our Youtube Channel

This manual is also suitable for:

Procon ht 225Htp 150Htp 225

Table of Contents