Case Removal - MHG Heating ProCon HT 150 Installation And Operating Manual

Floor standing condensing boiler range
Hide thumbs Also See for ProCon HT 150:
Table of Contents

Advertisement

4.1 Case Removal

A 4.0mm Allen Key is required to initiate the removal of the appliances case.
2. (1) Turn the MHG Logo, (2) insert
Finger and open the cover to the right.
MHG Heating Ltd, Unit 4 Epsom Downs Metro Centre, Waterfield, Tadworth, Surrey, KT20 5LR
P:0845 6448802 F:0845 6448803
© MHG Heating Ltd
1. Case In Place
3. Locate the top sprung hinge pin
4. Using a 4mm Allen
Key loosen and pull
down to release the
cover. The two captive
bolts.
E:info@mhgheating.co.uk
010617
W: www.mhgheating.co.uk
11

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ProCon HT 150 and is the answer not in the manual?

This manual is also suitable for:

Procon ht 225Htp 150Htp 225

Table of Contents