Disconnecting Power; Test Run - Grizzly G0727 Owner's Manual

Vertical/horizontal benchtop mill
Table of Contents

Advertisement

2.
Insert the power cord plug into a matching
power supply receptacle. The machine is
now connected to the power source.
Figure 9. Connecting power.

Disconnecting Power

1.
Press the STOP button on the side of the
control box to turn the master power switch
OFF.
2.
Grasp the molded plug and pull it completely
out of the receptacle. Do not pull by the cord
as this may damage the wires inside.
Figure 10. Disconnecting power.
-16-

Test Run

Once the assembly is complete, test run your
machine to make sure it functions properly.
If, during the test run, you cannot easily locate
the source of an unusual noise or vibration, stop
using the machine immediately, then review the
Troubleshooting on Page 29.
If you still cannot remedy a problem, contact our
Tech Support at (570) 546-9663 for assistance.
To test run the machine:
1.
Make sure you have read the safety instruc-
tions at the beginning of the manual and that
the machine is set up properly.
2.
Make sure all tools and objects used during
setup are cleared away from the machine.
3.
Rotate the spindle speed dial (see Figure 11)
all the way counterclockwise to set it at the
minimum speed for initial startup.
STOP
Button
Tab
Figure 11. Control box components.
Model G0727 (Mfg. Since 7/11)
Power
Lamp
Spindle Speed
Dial

Advertisement

Table of Contents
loading

Table of Contents