Energy Adjustment; Load Default - Sungrow SG8KTL-EC User Manual

Pv grid-connectedr inverter
Hide thumbs Also See for SG8KTL-EC:
Table of Contents

Advertisement

User Manual
Main Screen (Press ENTER)→Menu screen (Press ×3)→Set-param (Press
ENTER)→Enter password 111111 (Press ENTER)→Sys-param (Press ENTER)→
Time (Press ENTER)
On the "Time" screen, Press
right and Press
Confirm settings by pressing ENTER. The date format
is YY/MM/DD. YY, MM, and DD stand for year,
month, and day respectively. The time format is
hh/mm/ss. hh, mm, and ss stand for hour, minute, and
second respectively.

10.10.2 Energy Adjustment

If the accumulat ive value of "E-total" in the inverter is different from the value in the
external metering device, you should adjust the "Energy-adj" sett ing.
Main Screen (Press ENTER)→Menu screen (Press ×3)→Set-param (Press
ENTER)→Enter password 111111 (Press ENTER)→Sys-param (Press ENTER,
Press )→Energy-adj (Press ENTER)
On the "Energy-adj" screen, Press
cursor right and Press
value.
Confirm settings by pressing ENTER.
The positive symbol "+" can be changed to the
negative symbol "-" by pressing .
The adjustment range is from -9999 kWh to +9999
kWh.
(Energy-adj value)= (Real measured value) - (E-tot
reading value).

10.10.3 Load Default

All history information will be unrecoverable cleared and all parameters will
return to the default value except the protective parameters and time once
the "load default" operation is performed.
to move the cursor
to set the correct date and time.
to set the correct offset
to move the
10 Operat ing the LCD Menu
Ti m e
Dat e:
12/ 01/ 31
Ti m e:
10: 30: 55
Ener gy- adj
+0000kW h
87