Chapter 3: System planning
This chapter provides information to help the user to plan a PMP/PTP 450 platform link.
The following topics are described in this chapter:
•
Typical deployment
on page
•
Site planning
on page
3-7
including grounding, lightning protection and equipment location.
•
Radio Frequency planning
regulatory restrictions that apply in the country of operation.
•
Link planning
on page
3-6
loss and throughput.
•
Planning for connectorized units
connectorized ODUs with external antennas in PMP/PTP 450 platform links.
•
Data network planning
data networks.
•
Network management planning
managed remotely using SNMP.
•
Security planning
on page
mode.
Typical deployment
This section contains diagrams illustrating typical PMP/PTP 450 platform site deployments.
ODU with PoE interface to PSU
In the basic configuration, there is only one Ethernet interface, a copper Cat5e power over Ethernet (POE) from the
PSU to the ODU (PSU port), as shown in the following diagrams: mast or tower installation
installation
(Figure
28) and roof installation
3-2
contains diagrams illustrating typical PMP/PTP 450 platform site deployments.
describes factors to be considered when planning the proposed link end sites,
on page
3-15
describes how to plan PMP/PTP 450 platform links to conform to the
describes factors to be taken into account when planning links, such as range, path
on page
3-9
describes factors to be taken into account when planning to use
on page
3-11
describes factors to be considered when planning PMP/PTP 450 platform
on page
3-19
describes how to plan for PMP/PTP 450 platform links to be
3-20
describes how to plan for PMP/PTP 450 platform links to operate in secure
(Figure
29). Figure 27 Mast or tower installation
Page 3-1
(Figure 27
), wall