Installation; Inspection Of Unit; Unpacking The Cabinet; Ups Setup - ION F-16 User Manual

Line interactive ups 1kva/1.5kva/2kva/3kva
Table of Contents

Advertisement

3. Installation

3.1 Inspection of Unit

Inspect the UPS upon receiving. If the UPS appears to be damaged from
shipment, keep the box and packing material in its original form from the carrier
and notify the carrier and dealer immediately.

3.2 Unpacking the Cabinet

To unpack the system:
1. Open the outer carton and remove the accessories packaged with the
cabinet.
2. Carefully lift the cabinet out of the outer carton and set it on a flat, stable
surface.
3. Discard or recycle the packaging in a responsible manner, or store it for
future use.

3.3 UPS Setup

All model series are designed for tower and rack deployment and can be
installed into a 19 inch equipment rack. Please follow the instruction for Tower
Setup and Rack-Mount Setup.
Tower setup
This series of ION UPS can be placed horizontally and vertically. For a tower
configuration, stands have been provided to stabilise the UPS when it is
positioned vertically. The UPS stand must be attached to the bottom of the
tower.
4

Advertisement

Table of Contents
loading

Table of Contents