Ebm Installation (Optional) - ION F-16 User Manual

Line interactive ups 1kva/1.5kva/2kva/3kva
Table of Contents

Advertisement

3.4 EBM Installation (Optional)

Connecting the EBM in Tower form:
1. Slide the UPS and EBM down vertically and place the two UPS stands with
the extended part at the end of the tower.
2. Tighten the screw on the metal sheet to stabilise
3. Connect the Earth line from UPS (port A) to EBM (port B)
A
B
9

Advertisement

Table of Contents
loading

Table of Contents