LIFTING

When moving the machine, we strongly suggest you choose any one of the methods described below to
move your machine.
1.
(Only applies to the machine with the design of the hanging point.)
Move the machine to its location by using a crane and a wire rope sling that can fully withstand the
weight of the machine (refer to machine specification under Section 2 General Information).
Machine hanging with a crane should be done strictly according to the hanging points
designated by the original manufacturer. If there is any doubt on missing hanging points on your
machine, please consult with the original manufacturer or its qualified agent before hanging the
machine.
Machine lifting is likely to damage the machine
if not performed properly.
Warning: You must have a qualified crane
operator to perform the job.
You must use tools and equipment with the
proper tensile strength and use proper method
when moving your machine.
Apply the wire rope sling to the lifting hooks on
the four ends of the machine.
Illustration: Lifting Points for exact locations.
Slowly lift the machine. Be sure to protect the
machine from impact or shock during this
procedure. Also watch out your own fingers and
feet to avoid injuries.