Ceiling Pocket Preparation - Screen Innovations Zero-G Owner's Manual

Flush mount
Hide thumbs Also See for Zero-G:
Table of Contents

Advertisement

CEILING POCKET PREPARATION

BLOCKING REQUIRED. THE CEILING OR WALL USED FOR FIXTURE INSTALLATION
MUST BE ABLE TO SUPPORT 300 LBS OR MORE. FAILURE TO PROPERLY SECURE
THE SCREEN MAY RESULT IN INJURY AND/OR DAMAGE.
1
2
8
Measure the full length of the case (F)
F
11/2
+
CASE LENGTH
CLEARANCE
121/2
W
Cut a hole in the ceiling using the Z and W values
from the formula above.
Z
"
=
+/-
LENGTH
OF OPENING
W
"
=
+/-
DEPTH
OF OPENING
Z
ZERO-G
1/4
"
TOLERANCE
1/4
"
TOLERANCE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents