SUSPENDED CEILING PREPARATION

FAILURE TO PROPERLY LEVEL THE MOUNTING BRACKETS WILL CREATE ISSUES
WITH THE SCREEN OVER TIME, DAMAGING THE SCREEN MATERIAL.
1
300 lbs
(90gk)
2X to 3X
Secure 4 threaded rods to structural supports above the
2
Hook the suspended ceiling brackets into the case as shown.
Position along the length of the case such that the large holes
112216ZGFL
4" - 20"
(10.16 cm - 50.8 cm)
installation location as shown.
will line up with the threaded rods, and lock down.
Stuctural Member
4" - 20"
(10.16 cm - 50.8 cm)
Ceiling
Z
ZERO-G
15