GE N60 Instruction Manual page 251

Network stability and synchrophasor measurement system ur series
Hide thumbs Also See for N60:
Table of Contents

Advertisement

5 SETTINGS
OPEN POLE BROKEN CONDUCTOR: This setting enables or disables detection of broken conductor or remote pole
open conditions.
OPEN POLE VOLTAGE INPUT: This setting is used to enable/disable the voltage input in making a logical decision. If
the line VT (not bus VT) is available, the voltage input can be set to "Enable".
OPEN POLE VOLTAGE SOURCE: This setting is used to select the voltage source for the element.
φ
OPEN POLE
A(C) AUX CONTACT: These three settings used to select a FlexLogic™ operand reflecting the state of
the 52b type phase A circuit breaker auxiliary contact (closed when main breaker contact is open) for single-pole trip-
ping applications. If two breakers per line are used, then both breaker auxiliary contacts feeding into the AND gate
(representing auxiliary contacts connected in series) are to be assigned.
OPEN POLE PICKUP DELAY: This setting is used to select the pickup delay of the element.
OPEN POLE RESET DELAY: This setting is used to select the reset delay of the element. The use of this setting
depends on the particular application and whether single-pole or three-pole tripping is used. It should comprise the
reset time of the operating elements it used in conjunction with the breaker opening time and breaker auxiliary contacts
discrepancy with the main contacts.
SETTING
OPEN POLE
FUNCTION:
Disable=0
Enable=1
SETTING
OPEN POLE BLOCK:
Off=0
SETTING
OPEN POLE
A
AUX CONTACT:
AND
Off=0
SETTING
OPEN POLE
B
AUX CONTACT:
AND
Off=0
SETTING
OPEN POLE
C
AUX CONTACT:
AND
Off=0
SETTING
OPEN POLE BROKEN
CONDUCTOR:
Enable=1
Disable=0
SETTING
SETTING
OPEN POLE
CURRENT PICKUP:
OPEN POLE
CURRENT SOURCE:
RUN
AND
A
A > SETTING
B
B > SETTING
C
C > SETTING
SETTING
OPEN POLE
VOLTAGE INPUT:
Enable=1
Disable=0
SETTING
OPEN POLE
VOLTAGE SOURCE:
AND
RUN
WYE
DELTA
VA < 75% Nominal
VAG or
VAB
VBG or
VBC
VB < 75% Nominal
VCG or
VCA
VC < 75% Nominal
GE Multilin
N60 Network Stability and Synchrophasor Measurement System
OR
AND
AND
AND
AND
Figure 5–57: OPEN POLE DETECTOR SCHEME LOGIC
5.6 GROUPED ELEMENTS
OR
OR
OR
OR
AND
AND
SETTING
OPEN POLE
PICKUP DELAY:
FLEXLOGIC OPERAND
OPEN POLE
RESET DELAY:
OPEN POLE OP
5
ANY PHASE
A
OPEN POLE OP A
B
OPEN POLE OP B
C
OPEN POLE OP C
827047A6.CDR
5-133

Advertisement

Table of Contents
loading

Table of Contents