Vertiv 24BA1200-23 Installation Manual page 2

Netsure battery rack system (+24 vdc)
Table of Contents

Advertisement

The information contained in this document is subject to change without
notice and may not be suitable for all applications. While every precaution
has been taken to ensure the accuracy and completeness of this
document, Vertiv Group Corporation assumes no responsibility and
disclaims all liability for damages resulting from use of this information or
for any errors or omissions. Refer to other local practices or building codes
as applicable for the correct methods, tools, and materials to be used in
performing procedures not specifically described in this document.
This document may contain confidential and/or proprietary information of
Vertiv Group Corporation, and its receipt or possession does not convey
any right to reproduce, disclose its contents, or to manufacture or sell
anything that it may describe. Reproduction, disclosure, or use without
specific authorization from Vertiv Group Corporation is strictly prohibited.
Vertiv and the Vertiv logo are trademarks or registered trademarks of
Vertiv Group Corporation. NetPerform™, NetReach™, NetSure™ and
NetXtend™ are trademarks of Vertiv Energy Systems, Inc. All other
trademarks are the property of their respective owners.
© 2017 Vertiv Energy Systems, Inc. All rights reserved.
Vertiv
| NetSure Battery Rack System (+24 VDC) Installation Manual (Section 6044) | Rev. E
2

Advertisement

Table of Contents
loading

This manual is also suitable for:

24ba1200-19

Table of Contents