Rinnai Neo RIB2312L Installation Manual page 19

Neo series
Hide thumbs Also See for Neo RIB2312L:
Table of Contents

Advertisement

Connect the gas supply
12
Refer p. 8.
Secure engine to the enclosure
13
Fasten the engine to the enclosure using appropriate fasteners (not supplied), using the
three holes across the top and at least two holes on each side, refer p. 17.
Leak test
14
Leak test all appliance connections. When finished remove any residue with a rag, Prevent
any soapy solution coming into contact with the electrical components.
Complete the installation
15
Refer p. 22-28.
Assemble and fit the zero clearance box
Prepare heater engine and fit cladding
Align guide rails with the guide plate
Drill
4 x Ø 3.2 mm
holes
Neo RIB2312 installation guide: 12148-A 01-17 | 19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Neo rib2312n

Table of Contents