Installation - QUBINO Flush 2 relay User Manual

Z-wave
Table of Contents

Advertisement

7. Installation

Before installing the device, please read the following carefully and follow the instructions
exactly:
Danger of electrocution!
Installation of this device requires a great degree of skill and may be performed only by a
licensed and qualified electrician. Please keep in mind that even when the device is turned off,
voltage may still be present in the device's terminals.
Note!
Do not connect the device to loads exceeding the recommended values. Connect the device
exactly as shown in the provided diagrams. Improper wiring may be dangerous and result in
equipment damage.
Electrical installation must be protected by directly associated overcurrent protection fuse
4A, gG or Time lag T, rated breaking capacity 1500A (ESKA 522.723) must be used according to
wiring diagram to achieve appropriate overload protection of the device. The fuse must be
installed in fuse holder type: Adele contact 503Si/1 DS according to the standard IEC60669-2-
1. This standard is used in Europe only.
21
EN.

Advertisement

Table of Contents
loading

Table of Contents