11. Attach the Middle Pulley Arms and Route the Middle Ropes
Note: The parts have a right (" R ") and left (" L ") mark to assist with assembly. If necessary, push the Upper Pulley Arms toward the back
to align the side hardware openings. Attach front hardware first ( * ). Do not fully tighten until all hardware has been started. Attach a securing ball to
the end of the rope after routing. Start the rope through the oval opening of the securing ball, and pull out of the round opening.