Installation Of The Equipment; Figure 7: Location Of 115/230 V Switch - Motorola Canopy User Manual

Cluster and gen ii cluster
Hide thumbs Also See for Canopy:
Table of Contents

Advertisement

The AC power connectors are labeled
-
N for Neutral
-
L for Line
-
PE for Protective Earth (PE)
The maximum thickness wire to be used is 12 AWG (4 mm

INSTALLATION OF THE EQUIPMENT

The following tools may be needed during installation:
3/8" nut driver
12" adjustable wrench
7/16" wrench for installation of GPS mounting bracket
14mm wrench for installation of Cluster Management Module pole-mounting brackets
Needle-nose pliers
When power is applied to a Canopy module or the unit reset via the web-based interface, the
module will take approximately 25 seconds to boot up. During this boot up time, power on self-
tests and other diagnostics are being performed.
The following steps are needed to install the Canopy equipment:
Remove the base cover from all Canopy Access Point modules to be installed.
Remove the GPS sync cable knockout from the base cover with needle-nose pliers.
Mount the Access Point modules:
AP_CMM2 User Manual

Figure 7: Location of 115/230 V Switch

(ground)
Fuse receptacle
AC power
connectors
115/230 V switch
2
).
Page 26 of 49

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents