Link Test; Time & Date; Figure 15: Link Test Web Page - Motorola Canopy User Manual

Cluster and gen ii cluster
Hide thumbs Also See for Canopy:
Table of Contents

Advertisement

LINK TEST

The Link Test is a test for measuring the throughput and efficiency of the RF link between two
Canopy modules.
To perform a link test enter a number into the field labeled " Duration ". The duration is the number
of seconds the RF link will be tested. Start the link test by clicking the " Start Test " button. The test
will now run for the set duration. If the web page is not set to automatically refresh, click the
" Refresh Display " button to see the results. For a Canopy System link to be considered acceptable
it is necessary for the efficiencies of the link test to be greater than 90% in both the uplink and
downlink direction. It is recommended that when a new link is installed that a link test be executed
to ensure that the efficiencies are within recommended guidelines.
The key fields are:
Downlink RATE, bits per second
Uplink RATE, bits per second
Downlink Efficiency, percent
Uplink Efficiency, percent
TIME & DATE
This web page is used to set the time and date of the Access Point module when it is not
connected to a Cluster Management Module (CMM). The time and date would need to be set
every time there is a power cycle. The format for the entry is:
hh:
two digit hour in military time
mm:
two digit minute
ss:
two digit second
mm:
two digit month
AP_CMM2 User Manual

Figure 15: Link Test web page

Time: hh:mm:ss Date: mm/dd/yyyy
Page 41 of 49