Earlier units had four openings on the bottom of the Cluster Management Module as shown in the
following figure. Currently shipping units have two additional Ethernet cable and GPS sync cable
openings, to allow use of thicker, shielded cables.
N-connector to GPS antenna
GPS sync cables
Network feed
Power feed
Ethernet cables
Figure 3: Bottom view of Cluster Management Module, Installed
2
2
Mains AC power feed should be either 12 AWG or 14 AWG (4 mm
or 2.5 mm
) wire, with the
thicker gauge recommended for longer power runs.
AP_CMM2 User Manual
Page 13 of 49