System Diagram - Vaillant ecoCRAFT exclusive VKK GB 1206/3-E R1 Installation And Maintenance Instructions Manual

Table of Contents

Advertisement

Appendix
Appendix
A

System diagram

16a
13
3
230 V~
3
2BUS
2
42a
3
1
1
Heat generator
2a
Heat generator pump in the heat generation circuit
2b
Heating pump (heating circuit 1)
2c
Heating pump (mixing circuit 2)
5
Domestic hot water cylinder
10
Thermostatic radiator valve
13
Weather compensator
15
3-way mixer
16
outside temperature sensor
17a
Flow temperature sensor
17b
Flow temperature sensor (heating circuit 2, mixing
circuit)
19
Maximum thermostat
21a
Remote control (radiator circuit)
B
Start-up checklist
No.
Procedure
1
Checking the gas flow pressure
2
Check whether the condensate siphon
has been filled
3
Check the electrical connection
4
Switch on the product, the display view
is active
5
Activate the maximum output operation
30
21a
2
2
BUS
10
2
30
3
2b
3
47
17a
45
33
32
42b
Comment
The gas flow pressure relative to the
atmospheric pressure must be 1.8-
2.5 kPa (18-25 mbar) with G20 nat-
ural gases. For natural gas, the gas
connection pressure (resting pres-
sure) must not deviate from the gas
flow pressure by more than 0.5 kPa
(5 mbar).
If required, fill it via the flue spigot (at
least 1.5 l water)
Power supply: Terminals L, N, PE
Control terminals: "Bus", or 7-8-9 or 3-4
Otherwise, check the fuses (4 OT)
Press the + and − buttons at the same
time
Installation and maintenance instructions ecoCRAFT exclusive 0020149561_01
21b
52
2
3
17b
3
19
30
3
30
2c
31
4
15
27
21b
Remote control (underfloor circuit)
24
Cylinder temperature sensor
27
Cylinder charging pump
30
Non-return valve
31
Flow limiter
32
Cap valve
33
Sludge separator
42a
Expansion relief valve
42b
Expansion vessel
43
Safety group
45
Low loss header
46
Circulation pump
47
Air separator
52
Room temperature-controlled valve
3
2
30
46
5
24
43
Required tool
U tube or digital pressure gauge

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents