Start commissioning wizards

You can start the commissioning wizard at any time via the menu item described
below and benefit from the structured processing of commissioning parameters.
The scope of the commissioning wizard differs between the room unit QAA74 and
operator unit AVS74.
Section "Commission plant using the commissioning wizard [➙ 71]" includes a
sketch of the commissioning wizard structure and notes about its start-up
behavior.
QAA74
The Adjust/repair pages (
l
Proceed as follows to start the commissioning wizard:
From the topic list, select "Commissioning wizard" and confirm the selection.
Notes on these parameters are available in Section "Room/operator unit
parameters [➙ 86]".
AVS74
The Adjust/repair pages (
l
Proceed as follows to start the commissioning wizard:
From the topic list, select "Commissioning wizard" and confirm the selection.
Notes on plant parameters are available in the user's guide for your controller.
Graphical User Interface UI400
) are selected.
) are selected.