HP FlexFabric 11908-V Installation Manual page 110

Flexfabric 11900 series
Table of Contents

Advertisement

grounding switch through DC power supply RTN
wire,
18
grounding switch with grounding strip,
grounding the switch,
identifying IRF master switch,
identifying IRF member switch physical ports,
installing 19-inch rack cable management
brackets,
1
1,
12
installing 19-inch rack cage nuts, 6,
installing 19-inch rack mounting brackets,
installing 19-inch rack slide rail, 6,
installing fan tray,
55
installing FRU,
20
installing IRF member switch,
installing LPU,
21
installing MPU,
21
installing power supply,
installing switch,
6
installing switch on 19-inch rack,
installing switching fabric module,
installing transceiver module (optional),
making Ethernet twisted pair cable,
mounting switch on workbench,
planning IRF connections,
planning IRF fabric installation site,
planning IRF member IDs,
planning IRF topology,
powering on switch, 39,
removing cable management brackets,
removing console cable,
removing fan tray,
54
removing grounding cable,
removing mounting brackets,
removing power cable,
removing switch chassis from rack,
removing the optical fiber,
removing twisted pair,
repackaging card,
92
repackaging power supply,
repackaging switch accessories,
repackaging switch chassis, 92,
repackaging the switch,
replacing card,
51
replacing fan tray,
54
replacing power supply,
16
16
31
10
1 1
6
32
24
6
21
28
81
14
32
31
31
32
39
93
90
90
93
90
92
91
91
91
91
95
90
50
replacing QSFP+ cable,
replacing QSFP+ to SFP+ cable,
replacing QSFP+ transceiver module, 56,
replacing SFP transceiver module, 56,
replacing SFP+ cable,
32
replacing SFP+ transceiver module, 56,
replacing transceiver module,
replacing XFP transceiver module, 56,
setting configuration environment,
setting terminal parameter,
setting up IRF fabric,
testing network connectivity,
troubleshooting fan failure,
troubleshooting garbled terminal display,
troubleshooting LPU failure,
troubleshooting MPU failure,
troubleshooting no terminal display,
troubleshooting power supply system failure,
troubleshooting switching fabric module failure,
troubleshooting the switch,
verifying IRF fabric configuration,
verifying network access configuration,
Q
QSFP+
cable technical specifications,
connecting cable,
port LED technical specification,
QSFP+ to SFP+ transceiver cable technical
specifications,
replacing QSFP+ cable,
replacing QSFP+ transceiver module,
replacing transceiver module,
transceiver cable technical specifications,
transceiver module technical specifications,
QSFP+ to SFP+
cable technical specifications,
replacing QSFP+ to SFP+ cable,
R
rack
attaching mounting brackets to chassis (19-inch
rack),
12
dimension requirements,
installing cable management brackets (19-inch
rack),
1
1,
104
56
56
56
36
30
45
48
48
48
46
84
29
68
56
56
84
5
12
56
56
56
56
56
35
47
46
47
48
34
43
75
56
68
68
56

Advertisement

Table of Contents
loading

Table of Contents