  • Page 1 OWNERS MANUAL Joint Clean Out and Concrete Saw MODEL: GC25E UP FORM << GC25E UP rev 8/2012...
  • Page 2 WARRANTY Norton warrants all products manufactured by it against defects in workmanship or materials for a period of one (1) year from the date of shipment to the customer. The responsibility of Norton under this warranty is limited to replacement or repair of defective parts at Norton's Stephenville, Texas factory, or at a point designated by it, of such part as shall appear to us upon inspection at such point, to have been defective in material or workmanship, with...
  • Page 3: Table Of Contents

    Table of Contents CONTENTS PAGE I. Preparation A. Safety Precautions B. Assembly C. GC25E UP Joint Clean Out and Concrete Saw Specifications D. Pointer Alignment D. Electrical Connections GC25E UP 11-14 Power Connections Generators Wiring Diagram GC25E UP Thermal Reset...
  • Page 4: Preparation

    I. PREPARATION A. Safety Precautions Important! The following safety precautions must always be observed. Hazard Symbols Motor components can get extremely hot from operation. To prevent burns, do not touch the engine or related parts while the engine is running or immediately after it is turned off. Never operate the engine with any heat shields or guards removed.
  • Page 5 Dust and Silica Warning Grinding/cutting/drilling of masonry, concrete, metal and other materials can generate dust, mists and fumes containing chemicals known to cause serious or fatal injury or illness, such as respiratory disease, cancer, birth defects or other reproductive harm. If you are unfamiliar with the risks associated with the particular process and/or material being cut or the composition of the tool being used, review the material safety data sheet and/or consult your employer, the material manufacturer/supplier, governmental...
  • Page 6 1. Before mounting any blade on the saw, the blade should be inspected for any damage which might have occurred during shipment, handling or previous use. 2. The blade collars and arbors should be cleaned and examined for damage before mounting the blade. 3.
  • Page 7: Assembly

    I. PREPARATION B. Assembly The GC25E UP compact Joint Clean Out and Concrete saws are shipped completely assembled and ready for use except for diamond blade, Handle Bar position, electrical extension cord (not supplied), and power supply. Inspect the saw for shipping damage.
  • Page 8: Gc25E Up Joint Clean Out And Concrete Saw Specifications

    C. GC25E UP Series Joint Clean Out and Concrete Saw Specifications Dimensions/Weight GC25E UP Length (Working) 42-23/32” (1,090mm) Length (Transport) 32: (813mm) Width 18-1/8" (460mm) Height 42-23/32” (1,090mm) Frame Width 18-1/8” (460mm) Pointer Length 8-7/32”(209mm) Blade To Wall 7-1/2” (190mm) Wheel Base Length 19”...
  • Page 9 The GC25E UP Joint Clean Out and Concrete Saw was designed from the ground up to be a High Performance Multiple Application saw. The GC25E UP is the best electric Joint Clean Out saw on the market and is capable of cutting Cured Concrete and Asphalt.
  • Page 10: Pointer Alignment

    D. Pointer Alignment 1. Use a straight edge, and carefully mark a line 12 feet long on a smooth level surface. 2. Place the saw blade on the marked line, move the saw to the center of the marked line and then lower the blade until it is about 1/16” above the marked line.
  • Page 11: Electrical Connections Gc25E Up

    UP on a circuit with a 30A circuit breaker. If a 30A circuit is not available the use a 20A. The GC25E UP will require up to 18A when under full load. In no case should the connecting wires be longer than shown in the following table for use with the GC25E UP...
  • Page 12: Generators

    Extension Cord. 2. Low Voltage Power Supply. Use a power supply with the correct voltage. 3. Incorrect Blade of Application. Contact Norton Clipper’s customer service or your local sales person for the correct blade specification for your cutting application.
  • Page 13: Electrical Trouble Shooting

    See section “Power Connections:” for addition extension cord information. 4. The voltage range for the GC25E UP saw is 108v to 125v with 115 to 120v being perfect. Lower than 108v will cause motor overheating, circuit breaker tripping, and motor failure over time.
  • Page 14 Spread the tools over different circuits, especially the higher amperage drawing products (Vacuums and saws). 6. Let the GC25E UP work for you. As you push it harder the motor will draw more amperage which will over time trip the breaker. The motor with a medium working load will pull around 13A and will run with no problem.
  • Page 15: Operation

    II. OPERATION A. Installing the Blade 1. Verify that the GC25E UP is disconnected from the power supply and that the ON/OFF switch is in the “OFF” position. 2. Remove the 5/16”-18 UNC x ¾” Right Hand Thread Cap Screw, 5/16 Lock Washer, 5/16 SAE Washer from the end of the blade (rotate Counter Clock Wise - CCW).
  • Page 16: Operating The Saw

    1. For blade installation instructions see section II. Operation sub heading A. Installing the Blade. Electrical Connections see section E. Electrical Connections GC25E UP 2. Loose the Depth Lock Thumb Screw ½ Turn. 3. Raise the saw to the full upright position. Do not let the blade come in contact with the ground.
  • Page 17 Verify that the GC25E UP power switch in the “OFF” position. Connect the extension cord set to the machine and power supply. Follow all local and national electrical code. If unsure of how to connect the extension cord set or of the electrical circuit have a qualified Electrician make all electrical connections.
  • Page 18 2” Vacuum Port Vacuum Port Location 10. Connect the power supply to the machine. NOTE: The GC25E UP is equipped with a Extension Cord Support. The Extension Cord Support will hold the Extension Cord while using the machine. To use remove the Locking...
  • Page 19 12. Slowly move the machine forward 13. After cutting about 3’ lower the rear pointer into the joint. The rear pointer is designed to slide into the joint path to help keep the GC25E UP in alignment with the joint to be cleaned.
  • Page 20: Cutting Technique

     Go slowly with a new blade until it opens up, that is, until the diamonds can be seen and felt. E. Joint Clean Out The new Norton Clipper GC25E UP is specifically designed for Joint Clean Out. The machine features a Center Line cut system that allows the machine to track...
  • Page 21 8. Let the GC25E UP work for you. As you push it harder the motor will draw more amperage which will over time trip the breaker. The motor with a medium working load will pull around 13A and will run with no problem.
  • Page 22: Maintenance

    III. MAINTENANCE A. Electric Motor The GC25E UP is designed with a maintenance free dual voltage totally enclosed fan cooled motor. B. Bearings The GC25E UP is equipped with permanently sealed blade shaft and wheel bearings that will never need any lubrication. These types of bearings are designed for long life and minimum maintenance.
  • Page 23: Depth Control

    7. Line up the straight edge along the outside face of both pulleys as shown in the drawing. 8. Misalignment will show up as a gap between the pulley face and the straight edge. 9. Make sure that the width of the outside land (Area between the belt and the edge of the pulley) is equal on both pulleys.
  • Page 24: Dust Removal System Adjustment

    VACUUM SHOURD GC25E UP 241163 NOTE: All Parts Are Sold As Individual (each) Unless Noted Otherwise Blades Use Only Norton Diamond Blades. Contact your local Norton Clipper Distributor or Norton Clipper at 1-800-554-8003 for the best blade for the application.
  • Page 25: Parts Drawing / Service Parts List

    Blade Guard Assembly GC25E UP Item Part No Description Type NOTES 241160 BLADE GUARD WELDMENT GC25E UP Blade Guard Only GC25E UP ONLY 241161 VACUUM SHORUD PLATE GC25E UP GC25E UP Only 241162 SHROUD CLAMP GC25E UP GC25E UP Only 241163...
  • Page 26: Cutting Head Assembly Gc25E Up

    Cutting Head Assembly GC25E UP Item Part No Description Type NOTES 241151 CUTTING HEAD W/BEARING GC25E UP GC25E UP Only 241006 PULLEY IDLER TENSION ADJUSTER 241007 SPACER INDLER 241008 PULLEY IDLER ASSEMBLY 241010 SCR M12 x 80 1.75 DIN933 300323 SCR M8 X 25 1.25 DIN933 HHC FULL THD...
  • Page 27: Blade Shaft Assembly Gc25E Up

    Blade Shaft Assembly GC25E UP Item Part No Description Type NOTES 241150 CUTTING HEAD GC25E UP GC25E UP Only 241016 BLADE SHAFT 241017 BEARING COVER BLADE SHAFT 212142 BEARING RADIAL 20MM .787B Sold As Each RETAINING RING E-STYLE 19mm X 1.8mm...
  • Page 28: Depth Control Assembly Gc55 And Gc25E Up

    Depth Control Assembly GC25E UP Item Part No Description Type NOTES 241090 DEPTH TUBE 241019 FIT GREASE ZERK M6 X 1.0 241020 SCR DEPTH CONTROL 241021 DEPTH CONTROL MOUNT 241022 SPACER HAND WHEEL 241023 HAND WHEEL 9201074 KEY 3/16X3/4 241024 CLAMP HOSE 13/16"...
  • Page 29: Motor Assembly Gc25E Up

    Motor Assembly GC25E UP Item Part No Description Type Notes Complete Motor (Items 2 to 21) 241112 MOT 2.5HP 115-230v/60/1 241113 COVER FAN 241114 GASKET RUN CAPACITOR COVER 241115 COVER RUN CAPACITOR 241116 GASKET START CAPACITOR COVER 241117 COVER START CAPACITOR...
  • Page 30: Frame Assembly Gc25E Up

    Frame Assembly Item Part No Description Type Notes Frame Only 241101 FRAME GC25E/GC25E UO 241040 SCR M8 X 65 1.25 DIN931 HEX HEAD CAP 241039 REAR POINTER 232110 WASHER M8 DIN125 FLAT 235104 WASHER M4 DIN125 FLAT 241041 NUT M8 1.25 LOCK DIN985 241042 NUT M4 0.7 LOCK DIN985 241058...
  • Page 31: Front Pointer Assembly Gc25E Up

    Front Pointer Assembly GC25E UP Item Part No Description Type NOTES 241085 POINTER WELDMENT Weldment Only, NO Components 241086 WHEEL 75X28X8mm 241087 FRONT POINTER ROD Sold As Each 232110 WASHER M8 DIN125 FLAT Sold As Each 241041 NUT M8 1.25 LOCK DIN985...
  • Page 32: Main Assembly Gc25E Up

    Main Frame Assembly GC25E UP Item Part No Description Type NOTES 241152 FRAME ASSY GC25E/GC25E UP Includes Wheels – NO additional Components 241109 CONDUIT 14.5MM OD X 10MM ID FLEXIBLE 241105 PANEL SWITCH 241107 PULLEY 70MM X 24MM 6G J SECTION...
  • Page 33 241155 BELT 380J6 J SECTION 6 GROOVE “J” Section Belt, Six (6) Grooves 380mm Long 241156 BELT GUARD GC25E UP GC25E UP ONLY 241157 ARM STAY LEVEL GC25E UP GC25E UP ONLY 241079 SPACER M14 241080 CAM STAY LEVEL 241081...
  • Page 34 Saint-Gobain Abrasives 2770 West Washington Stephenville, TX 76401 Phone: 800-554-8003 Fax: 800-443-1092...