Initial Configuration; Installing The Software Configuration Tool - Powerware 208/120V User Manual

Upgrade kit (208/120v, 380/220v, 400/230v, 415/240v)
Table of Contents

Advertisement

Initial Configuration

EATON Powerware
®
Energy Management System (EMS) Upgrade Kit User's Guide
This section describes how to use the supplied software configuration
tool to perform initial configuration and calibration. You can use either
the tool or the optional display (if installed) to configure the panels and
breakers.
After initial configuration, interface with the EMS−UGK using a Web page
interface, the Advanced Metering monitoring system, or (if the optional
display is installed) directly through the display.

Installing the Software Configuration Tool

NOTE For best results, install the software configuration tool on a computer running the
Microsoft
Windows
XP or Windows 2000 operating system.
®
®
To install the software configuration tool:
1.
Connect a computer to the service port on the electronics module
using the supplied DB−9 to RS−232 serial cable.
2.
Set the computer's COM port settings to COM1, 19200 baud.
3.
Verify that the computer's settings for the date and time are
correct. The configuration tool uses the computer's settings to
automatically set the date and time for the EMS−UGK. You can
disable this feature later if needed.
4.
Insert the EMS Configuration Tool CD into the computer's CD drive.
The installation program begins automatically within 10 seconds.
If the installation program does not begin automatically, run the
CD_Menu.exe program on the CD.
5.
Follow the installation program instructions to install the tool.
6.
Continue to the following section, Initial System Configuration."
S
164201724 Rev 1 www.powerware.com
INSTALLATION
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

380/220v400/230v415/240vEnergy management system

Table of Contents