Checking The Parts List - Powerware 208/120V User Manual

Upgrade kit (208/120v, 380/220v, 400/230v, 415/240v)
Table of Contents

Advertisement

INSTALLATION

Checking the Parts List

8
EATON Powerware
®
Energy Management System (EMS) Upgrade Kit User's Guide
Verify that the following items are included with the EMS−UGK.
All models
Electronics module (display optional)
Mounting bracket (installed on electronics module)
EMS Configuration Tool CD for setup and calibration
EMS configuration cable (DB−9 to RS−232 serial)
This user's guide
Power Xpert Gateway Series 1000 Card (installed on electronics module)
Card configuration cable (RJ−45 to RS−232 serial)
Ethernet cable
Power Xpert Gateway Series 1000 Card registration card
Power Xpert Gateway Series 1000 Card Quick Start Instructions
NOTE For more detailed information, download the Power Xpert Gateway Series 1000
Card User's Guide from the Documentation page on the Power Xpert card once the card
is accessible on the user's network or from www.eaton.com/powerxpert.
All models (for each panel ordered)
(2) Branch circuit harnesses, each with one 28−position circular connector and
21 two−position connector plugs
(44) Branch current transformers (CTs), split−core, 75A, 1V output, with two−position
connector receptacle (includes 2 spares) (optional)
(1) Voltage harness, with one 7−position circular connector, three spade connectors
(A, B, C), and two ferrule connectors (Neutral, Ground)
NOTE Dual panel option only. Voltage harness V2 does NOT include a connector for
Ground.
(10) Wire taps:
2
− (5) 4.0 mm
(12 AWG), yellow
2
− (5) 0.75–2.5 mm
(18–14 AWG), blue
(3) Wire tap transition harnesses, each with a quick disconnect receptacle and a ferrule
connector
S
164201724 Rev 1 www.powerware.com

Advertisement

Table of Contents
loading

This manual is also suitable for:

380/220v400/230v415/240vEnergy management system

Table of Contents