Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Chapter 2 Installing Cabinet Assemblies
This chapter introduces how to install cabinet assemblies on the cement floor and
antistatic floor. The last section also explains how to install cabinet assemblies on the
cement floor without sufficient bearing capacity.
Cabinet assemblies include:
Lower support, used for the installation on cement floor
A600 support, used for installation on antistatic floor
U-bar support, used for the installation on cement floor without sufficient bearing
capacity
Figure 2-1 shows how to select the support according to environments.
Install U-bar
support
Figure 2-1 Selecting assemblies for installation
2.1 Introduction to Cabinet Assemblies
This section introduces the following information of the lower support, A600 support,
and U-bar support:
Outline
Assemblies
N
Is the ground
Y
load is less
2
than 5.5kN/m
Huawei Technologies Proprietary
Chapter 2 Installing Cabinet Assemblies
Start
Y
Is there anti-static
floor
N
Install low er
support
End
2-1
Install
support