Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station

Chapter 1 Installation Preparations

This chapter introduces the preparations before BTS3606 installation from the
following aspects:

Project Files

Tools and Instruments

Installation Conditions
Unpacking
1.1 Project Files
Table 1-1 lists the project files relative to the hardware installation.
Table 1-1 Project files
File type
Instruction
files for the
project
installation
Product
manuals
Other
project files
1.2 Tools and Instruments
Table 1-2 lists the tools and instruments needed for the installation.
File name
Network Planning, Equipment
room Layout, Detailed
Construction Drawing, and
Cable Routing Drawing
Site Survey Report
Engineering Design
Airbridge BTS3606&3606A
CDMA Base Station
Installation Manual
Contract
Equipment Configuration List
Delivery List
Huawei Technologies Proprietary
1-1
Chapter 1 Installation Preparations
Description
The customer must provide the
copies of these documents to the
equipment supplier before the
equipment shipment.
It is filled in by the supplier engineer
on site.
Huawei engineers make this design
based on the configuration at each
office, which is shipped together with
the equipment.
Shipped together with the
equipment.
Shipped together with the
equipment.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3606a

Table of Contents