Index - Huawei BTS3606 Installation Manual

Airbridge cdma base station
Hide thumbs Also See for BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606 Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
A
anchor bolt, 2-15
B
baseband board
BCIM, 3-5
BCKM, 3-5
CCPM/CECM, 3-5
C
cabinet assembly
A600 support, 2-3
lower support, 2-2
U-bar support, 2-4
cabinet configuration, 3-4
cabinet door
left-front and right-front doors, 3-4
rear door, 3-3
side door, 3-4
cabinet layout,principle, 2-5
checking cabinet equipment, 6-1
checking cable distribution, 6-3
checking room environment, 6-5
conducting insulation test, 2-11
D
DDF
120Ω DDF, 5-1
75Ω DDF, 5-1
installation procedure, 5-2
position, 5-1
disassembling expansion bolt, 2-9
drill bit, 2-8
drilling hole, 2-8, 2-13, 2-14, 2-20

Index

E
expansion bolt, 2-8
F
fixing lower support, 2-9
flowchart of
installing assembly on antistatic floor, 2-12
installing assembly on cement floor, 2-6
installing assembly on cement floor with poor
bearing capacity, 2-17
H
height-lock bolt, 2-15
I
installation condition
auxiliary equipment, 1-4
construction condition, 1-3
environment condition, 1-3
grounding condition, 1-4
load-bearing capacity, 1-3
power supply condition, 1-4
installation preparation, 1-1
installation procedure
checking cabinet installation, 6-1
installing cabinet and cabinet equipment, 3-1
installing cabinet assembly, 2-1
installing digital distribution frame, 5-1
installing 24-channel alarm extension connector, 5-2
installing assembly
on antistatic floor, 2-11
on cement floor, 2-6
on cement floor with poor bearing capacity, 2-17
installing baseband board, 3-5
installing cabinet, 3-1
installing equipment in extension cabinet
Huawei Technologies Proprietary
i-1
Index

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bts3606a

Table of Contents