S4200-On Series Switch Installation; 1U Front-Rack Installation - Dell S4248FB-ON Installation Manual

S4200-on series
Hide thumbs Also See for S4248FB-ON:
Table of Contents

Advertisement

Figure 13. Four-post threaded round-hole installation
2
For each rail, attach the front and back flanges to the post flanges with two user-supplied screws at each end.

S4200-ON Series switch installation

You can mount the switch in the 1U front-rack or 1U two-post flush or center configurations. The following is an example of a front-rack
configuration:
For the 1U two-post configurations, slide the switch into the rails in the same manner as the four-post configurations.

1U front-rack installation

Configure the rails that are attached to the switch.
1
NOTE:
For more instructions, see the installation instruction labels on the rail.
Attach the inner switch rails to the S4200-ON Series (S4248FB-ON and S4248FBL-ON) switch.
Line up the rail with the mounting heads and attach the rail to the switch. Slide the rail back until it locks into place. The following
shows the detail of the front standoff with the locking tab:
S4200-ON Series installation
25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S4248fbl-on

Table of Contents