Dell S4248FB-ON Installation Manual page 26

S4200-on series
Hide thumbs Also See for S4248FB-ON:
Table of Contents

Advertisement

Figure 14. Attach switch rail
2
After installing both switch rails, line them up on the previously mounted ReadyRails and slide the switch in until it is flush with front of
rack.
To keep the switch from inadvertently sliding out of the rack and falling, about three inches before you fully insert your switch, the rail
locking feature engages.
26
S4200-ON Series installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S4248fbl-on

Table of Contents