Four-Post Threaded Installation - Dell S4248FB-ON Installation Manual

S4200-on series
Hide thumbs Also See for S4248FB-ON:
Table of Contents

Advertisement

Figure 12. Two-post center-mount threaded round-hole installation
2
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, see items 2 and 3.
3
Repeat this procedure for the second rail.

Four-post threaded installation

NOTE:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
For this installation, remove the tool-less latch castings from the front side of each ReadyRails assembly, see item 1.
Use a Torx screwdriver to remove the two screws from each front latch on the switch side of the rail. Remove the tool-less latch
casting. Retain the castings for future rack requirements.
24
S4200-ON Series installation

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

S4248fbl-on

Table of Contents