Mxg610S Setup Guide; Blade Server Preparation; Switch Module Installation - Dell MXG610s Setup Manual

Fibre channel switch module supporting fabric os 8.1.0_inx
Hide thumbs Also See for MXG610s:
Table of Contents

Advertisement

Topics:

Blade server preparation

Switch module installation

Serial connection
Static IP addresses
Optical transceivers and cabling installation
Port-side LEDs
Additional country-specific IEEE notices
Blade server preparation
Before you insert the switch module in the blade server chassis, meet the following
conditions:
The blade server is powered up.
The blade server chassis meets all its specific power requirements.
The I/O module bay C1 or C2 is empty and ready to receive the switch module.
If you are replacing an existing switch module, to maintain the proper cooling level in the
chassis, insert the replacement switch module within one minute.
Switch module installation
Insert the switch modules in the blade server chassis slots and check that the modules are
functioning properly.

MXG610s Setup Guide

MXG610s Setup Guide
2
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents