Gemtek Systems WLTFQR-121 User Manual page 11

Table of Contents

Advertisement

By now, the device should have got IP address from your DHCP server.
Step9:
How to verify CPE has a successful connection to the LTE eNodeB? This can be
Step10:
verified by observing the signal strength LEDs (Please refer LED Indications
section in Introduction chapter of this manual to find the location of these
LEDs on the device). At least one of these LEDs glowing continuously is an
indication of successful connection to the eNodeB. Now you can start
browsing the Internet.
LTE Indoor CPE | User Manual
P. 11

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents