Fig.7
Step 12
Measure and cut the extension pipe at the straight
end to the required dimension using the guide collar
provided.
Step 13
Lay the flue gasket onto the flue spigot and then fit
the extension pipe to the spigot using the grub
screws provided and seal using fire cement.
Step 14
o
Fit the spigot, 15
Adaptor and extension pipe so
that it completes the flue installation between the
stove adaptor (closure plate).
Step 15
Bolt the spigot to the stove and re-apply fire cement
to the seals where it may have been disturbed dur-
ing the installation.
Step 16
Replace the baffle by inserting it at an angle into the
stove as shown in Fig.8. Then lift the baffle up into
the top of the stove while maintaining it at an angle.
Twist the baffle so that it is above the support rail.
Then lift the back edge and slide the baffle back to
the rear of the stove so that the tab on the baffle
drops into the corresponding slot on the support rail.
Fig.8
Step 17
Plumb the boiler - See Plumbing Section. Check all
connections for leakage before insulating the boiler
and infilling the system.
Step 18
Fill the void around boiler with fire retardant insulat-
ing wool.