Physical Installation; Fastening The Fixture To A Flat Surface; Mounting The Fixture On A Truss - Martin RUSH MH 10 Beam FX User Manual

Table of Contents

Advertisement

Physical installation

Warning! Read 'Safety information' on page 5 before
installing the fixture.
The fixture is designed for indoor use only and must be used in
a dry location with adequate ventilation. Ensure that none of the
fixture's ventilation slots are blocked and all minimum distances
are observed.
The fixture must be installed by a qualified technician. It may be
operated in any orientation.
Fasten the fixture to a secure structure or surface. Do not stand
it on a surface or leave it where it can be moved or fall over. If
you install the fixture in a location where it may cause injury or
damage if it falls, secure it as directed in this user manual using
a securely anchored safety cable that will hold the fixture if the
primary fastening method fails.
Martin® can supply safety cables and rigging clamps that are suitable for use
with the fixture (see 'Included Items
Power cable, 1.5 m (4.9 ft.) 18AWG/0.75mm
Omega bracket for rigging clamp attachment
Accessories' on page 49).

Fastening the fixture to a flat surface

The fixture can be fastened to a hard, fixed, flat surface in any orientation.
Ensure that the surface and all fasteners used can support at least 10 times the
weight of all fixtures and equipment they will support.
Fasten the fixture securely. Do not stand it on a surface or leave it where it can
be moved or fall over. If you install the fixture in a location where it may cause
injury or damage if it falls, secure it as directed below with a securely anchored
safety cable that will hold the fixture if the primary fastening method fails.

Mounting the fixture on a truss

The fixture can be clamped to a truss or similar rigging
structure in any orientation. Use a suitable rigging clamp such
as a G-clamp or a half-coupler clamp (see illustration on right)
fastened to the included omega bracket.
To clamp the fixture to a truss:
1. Check that the rigging structure can support at least 10 times the weight of
all fixtures and equipment to be installed on it.
12
RUSH™ MH10 Beam FX User Manual
2
without mains plug

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents